V And T Number 29 Entering Tunnel
by Mitch Shindelbower
Title
V And T Number 29 Entering Tunnel
Artist
Mitch Shindelbower
Medium
Photograph
Description
The Virginia and Truckee Railroad (reporting mark VT) was built to serve the Comstock Lode mining communities of northwestern Nevada. At its height, the railroad's route ran from Reno south to Carson City, Nevada. In Carson City, the mainline split into two branches. One branch continued south to Minden, while the other branch traveled east to Virginia City. The first section constructed from Virginia City to Carson City was constructed commencing in 1869 to haul ore, lumber and supplies for the Comstock Lode.
The railroad was abandoned in 1950 after years of declining revenue. Much of the rail infrastructure was pulled up and sold, along with the remaining locomotives and railcars. In the 1970s, with public interest in historic railroads on the rise, the old lines were rebuilt by private investors, with an eye towards re-opening the lines.
Today, the privately owned Virginia & Truckee Railroad Company operates as a heritage railroad, headquartered in Virginia City. The Virginia & Truckee Railroad owns and uses the service mark "Queen of the Short Lines." The V&T Railroad runs up to 7 trains per day, many in steam behind locomotive #29, a 2-8-0 Consolidation, or an ex-US Army GE 80 ton diesel from Virginia City from Memorial Day until the end of October each year.
The public Nevada Commission for the Reconstruction of the V&T Railway has rebuilt the line from Gold Hill (connection with the current V&T Railroad) to Carson City, running the first train over the line in 68 years on 14 August 2009.[1] The Commission acquired a 1914 2-8-2 Mikado steam locomotive (The McCloud no. 18), which had been in use by the Sierra Railroad, out of Oakdale, California on special lunch and dinner trains. When the no. 18 arrived on the V&T, boiler problems were discovered, and the locomotive awaited repair at the Virginia and Truckee shops in Virginia City. She went to Hollywood for the filming of Water for Elephants. She returned after her scenes were filmed and finally had her first revenue run on July 24, 2010. Cars and locomotives from the original railroad are on display at the Nevada State Railroad Museum in Carson City, at the Comstock History Center on C Street in Virginia City, at the California State Railroad Museum in Sacramento and at the Railroad Museum of Pennsylvania in Strasburg.
In order to ascend the mountain to Virginia City it was necessary to build an enormous trestle. Popular Nevada mythology says Crown Point Trestle was considered to be such a feat of engineering that it is featured on the Nevada State Seal. This myth is mentioned by Lucius Beebe.[2]
Former Nevada State Archivist Guy Rocha debunks this myth on the state's Myth-a-Month page, pointing out that the state seal predates the trestle and shows a viaduct, not a trestle.In 1972, Robert C. Gray, who was one of the passengers on the last train to Virginia City in 1938, sought to rebuild the V&T as a tourist line. After gaining approval from Storey County, reconstruction of the line from F Street to the Eastern portal of Tunnel #4. The railroad's first operating season was 1976, utilizing former Dardenelle and Russellville #8 (renumbered to #28 to continue the old V&T numbering series), two open gondolas, and V&T caboose #10. The equipment had been leased from Short Line Enterprises, and it was too expensive to renew the rent, so the equipment was returned at the end the 1976 season. Locomotive #28 and Caboose #10 have since found their way to the Nevada State Railroad Museum, where #28 was given back its old D&R number.
For the 1977 season, the railroad faced a motive power shortage. The only locomotive available was ex-Pacific Portland Cement Company #3, a small Porter 0-4-0T locomotive that was very small, lacking in pulling power (only being able to pull one car at a time), and produced so much smoke, an extension had to be added to the smokestack. It was also around this time that the railroad acquired three pieces of ex-Western Pacific equipment from a siding in Reno (two boxcars and a bay window caboose). One of the box cars was converted into an open-air car, the caboose was modified for passenger service, and the second box car was converted into a tunnel car, which proved very instrumental in reopening Tunnel #4.
During the 1977 season, Bob Gray won an auction at the Longview, Portland and Northern Railway and walked away with 1916 Baldwin 2-8-0 #680. The locomotive was trucked to Virginia City and arrived safely (after many blown tires and having to sneak through Washoe due to trucks being forbidden in town on weekends). The locomotive was in good condition, and ran a charter train while still wearing its old identity. A month later, the locomotive was renumbered 29.
Work to re-open Tunnel #4 continued into the 1980s. The tunnel was finally reopened in the late 80s. Work had started on Tunnel #3 (which had a history of instability to the point that regular passenger cars could no longer fit by the time the last trains ran in 1938), but a large boulder shifted and buried the tunnel. A shoehorn was built around the tunnel, just enough as to not be too sharp for the locomotives, opening up a fantastic view of the valley. Conductors narrating the trip often erroneously state the tunnel collapsed in 1938, though recently, the correct information has been given.
In 1984, the railroad acquired a former SP 0-6-0 locomotive (#1251) from a park in Stockton, CA. Tracks had to be built through the park to pull the locomotive on to a truck. Since arriving in Virginia City, the locomotive has been given the tentative number of 30, but has been partially dismantled, and no noticeable work is currently occurring due to lack of funds.
The 1980s also saw the addition of ex-Feather River Short Line #8, a 1907 Baldwin 2-6-2. The locomotive arrived in operable condition, and was used alternatively with #29. During its career on the V&T, its number and lettering were never changed.
The line was reopened to Gold Hill in 1991 and marked by a double-header pulled by #29 and #8. Regular service between the two stations began soon after.
By 2001, #29 and #8 were in dire need of restoration, including new boilers. After the 2001 season, both locomotives were taken out of service. No other steam locomotives were available, so, for the first time in V&T history, a diesel was used. For the 2002 season, the railroad leased ex-Quincy Railroad #3, a GE 44-tonner. In 2003, another GE locomotive painted in V&T Yellow and Green and numbered D-2 (not related to the current D-2) was used. This locomotive's disposition is currently unknown, though it is known it had a standard 44-tonner horn.
For the 2004 season, a more permanent diesel was acquired in the form of ex-US Army GE 80-tonner #1694. It was repainted in the same paint scheme as the first D-2 and given the number D-1. The locomotive served as the mainstay of the fleet while #29 and #8 were down (as it would happen, #8 never ran on the V&T ever again due to a legal dispute with the Gold Hill Historical Society, the true owners of the locomotive).
As early as 1993, interest in rebuilding the route beyond Gold Hill had been expressed by the State of Nevada itself. The state set up a commission to rebuild the line known as the Nevada Commission for the Reconstruction of the V&T Railway.
In 2005, the Commission acquired a 1918 Baldwin 2-8-2 from the McCloud Railway. The locomotive, #18, is owned by the commission, but operated by the Grays operation.
Officials with the Commission held a "silver spike" ceremony January 3, 2006, in Carson City to commemorate the completion of two miles of track near Gold Hill. The construction, completed in September 2005, is part of an effort to restore the V&T's mainline from Virginia City to Carson City for operations. Then Senate Minority Leader Harry Reid (D-Nev), who was instrumental in securing $10 million in federal funding for the project, and Nevada Lieutenant Governor Lorraine Hunt, who secured an additional $1 million in state funding for the project, both spoke at the ceremony.
It is estimated that completion of the line from Gold Hill to Carson City will cost in excess of $55 million, and it is hoped that the line, which was originally abandoned in 1938, was planned be completed and operational once again in 2012.[20][21] However, as of 2013, trains only go as far as Eastgate Station.
In June 2008, #29 returned to traffic after a seven-year restoration including a new boiler. In early 2009, the locomotive's old silver boiler plate was replaced with a black one.
On August 14, 2009 the ceremonial first run from Virginia City to Mound House (mistakingly referred to as "Carson City Eastgate" in official material) occurred for VIPs. On the 15th and 16th the line opened to the public. Funds raised from these runs will be used to pay for the tracks through the Carson River Canyon, and will continue throughout the fall, every Saturday from August 22 through October 31. The runs will use the V&T Railroad's equipment (such as steam locomotive #29) and not that of the V&T Railway (owned by the Commission). Ticket price is set at $48.
The railroad is currently building up its collection, acquiring passenger cars from the nations museums and other private owners.
In May 2010, an ALCO S-4 was acquired from Montana in operable condition. It has been numbered D-2 (the number previously used for the locomotive used for the 2003 season).
On July 24, 2010, the No. 18 steam locomotive was brought on-line for revenue service. The locomotive had recently come back from Hollywood, appearing in the movie Water for Elephants.
In December 2010, an ex-CB&Q railcar was trucked into Virginia City. It was to be operational in time for the 2011 season, but is still undergoing restoration work. The V&T had previously acquired a motorcar in 1976, No. 50 Washoe Zephyr. It is currently at the Nevada State Railroad Museum in historical paint.
D-1 was fitted with a rare Hancock 4700 air whistle for the 2011 season to keep the familiar sound of a whistle around while #29 was down for maintenance, though some return riders believe it was due to sound complaints, as her old horn, a Nathan 3-chime horn, was very loud & could be heard all over town, echoeing off the canyon walls. This is not unprecedented, since the 80-tonners owned by the Valley Railroad in Essex, Connecticut are also equipped with Hancock whistles.
Also in 2011, a permanent water tank was built at the switch to the enginehouse.
Currently, there are plans for two extensions: one that will bring the trains back into the Carson River Canyon to the outskirts of Carson City (the original right-of-way into town has been built on), and one that will see the reopening of the E Street Tunnel (#6), moving the depot area from F Street to the old Freight Depot on E and Sutton Streets. Already, several privately owned cabooses displayed near the original 1869 passenger depot, now a private residence, have been moved to a siding at Gold Hill in anticipation of the extension.
Uploaded
May 24th, 2014
Embed
Share
Comments (10)
Kellice Swaggerty
Truly unique, Mitch! The composition, pov, natural framing, and lighting are all wonderful! l/f fb
Meg Shearer
Fantastic shot!!! I don't think I've ever seen a shot of a train entering a tunnel. Very cool! L/F!!!!